Phase 1
Consisted of prepping the surface (removing brush and high dirt spots), filling with Degenerated Granite as a base, and setting the flagstone into the DG.
Consisted of prepping the surface (removing brush and high dirt spots), filling with Degenerated Granite as a base, and setting the flagstone into the DG.